Categories
Traffic Study

Traffic Management Plan for Pedestrian Crossing Bridge Along SILK Highway

Ellipse-about

Traffic Management Plan for Pedestrian Crossing Bridge Along SILK Highway

Client

Wirasa Timur Sdn Bhd

Runding Trafik MZK Sdn Bhd prepared a Traffic Management Plan (TMP) for the proposed design and construction of pedestrian crossing bridges located along the SILK Highway.

The Traffic Management Plan was developed to facilitate safe traffic movement throughout the construction period while minimising disruption to highway users. Temporary traffic arrangements, safety measures, and traffic diversion strategies were incorporated to ensure compliance with highway operational requirements.

Scope of Services

  • Traffic Management Plan (TMP)
  • Temporary Traffic Diversion Planning
  • Construction Traffic Management
  • Road User Safety Assessment
  • Traffic Control Measures
  • Highway Coordination Support

Project Outcome

The Traffic Management Plan established a structured approach for maintaining road user safety and traffic flow throughout the construction period. The proposed traffic control measures and diversion arrangements were developed to minimise disruption while supporting project implementation requirements.

Categories
Traffic Study

Traffic Study for Proposed Mixed Development at Bandar Sunway, Selangor

Ellipse-about

Traffic Study for Proposed Mixed Development at Bandar Sunway, Selangor

Client

DK Land Property Management Sdn Bhd

Runding Trafik MZK Sdn Bhd was appointed to conduct a traffic study for a proposed mixed development located within Bandar Sunway, Petaling District, Selangor.

The study assessed the transportation implications of the proposed development and examined traffic circulation, accessibility, and connectivity within the surrounding road network. Detailed analysis was undertaken to support planning requirements and facilitate efficient traffic movement.

Scope of Services

  • Traffic Study
  • Traffic Flow Analysis
  • Development Accessibility Assessment
  • Road Capacity Evaluation
  • Transportation Planning
  • Traffic Mitigation Review

Project Outcome

The study assessed the transportation needs of the proposed mixed development and examined its interaction with surrounding infrastructure. The recommendations provided a framework for improving traffic circulation, accessibility, and connectivity within the project area.

Categories
Traffic Study

Traffic Study for Updating Expressways, Roads and Infrastructure Utilities in Sepang, Selangor

Ellipse-about

Traffic Study for Updating Expressways, Roads and Infrastructure Utilities in Sepang, Selangor

Client

MNF & Associates / Majlis Daerah Sepang (MDS)

Runding Trafik MZK Sdn Bhd carried out a comprehensive traffic study to support the updating of expressways, road networks, and overall infrastructure utilities within the District of Sepang, Selangor Darul Ehsan.

The study involved analysing existing traffic patterns, identifying transportation challenges, and assessing future traffic demands resulting from regional growth and development. The findings contributed towards transportation planning initiatives and infrastructure improvement strategies within the district.

Scope of Services

  • Traffic Study
  • Road Network Analysis
  • Transportation Planning
  • Traffic Demand Assessment
  • Infrastructure Integration Review
  • Technical Recommendations

Project Outcome

The traffic study provided data-driven analysis of existing transportation conditions and future traffic demands within the district. The findings supported infrastructure planning initiatives and contributed to the development of transportation improvement strategies for the growing region.

Categories
Traffic Impact Assessment

Traffic Impact Assessment for Proposed Development at Mukim Hulu Kelang, Gombak, Selangor

Ellipse-about
01_ulu_kelang_expressway_context

Traffic Impact Assessment for Proposed Development at Mukim Hulu Kelang, Gombak, Selangor

Client

Perancang Alam Reka

Runding Trafik MZK Sdn Bhd was engaged to prepare a Traffic Impact Assessment for a proposed development located within Mukim Hulu Kelang, District of Gombak, Selangor Darul Ehsan.

The study involved evaluating traffic conditions surrounding the development site and analysing the projected impact of future traffic demand on nearby roads and intersections.

Recommendations were developed to support safe and efficient vehicular movement while meeting planning and regulatory requirements.

Scope of Services

  • Traffic Impact Assessment (TIA)
  • Transportation Planning Analysis
  • Traffic Forecasting
  • Intersection Performance Assessment
  • Traffic Mitigation Recommendations
  • Authority Compliance Review

Project Outcome

The study evaluated the transportation implications of the proposed development and provided recommendations aimed at maintaining effective traffic circulation and accessibility. The assessment contributed to the overall planning process by addressing potential traffic impacts on the surrounding road network.

Categories
Traffic Impact Assessment

Traffic Impact Assessment for Proposed Shop Office Development at Bandar Puchong Jaya, Selangor

Ellipse-about
01_puchong_jaya_junction

Traffic Impact Assessment for Proposed Shop Office Development at Bandar Puchong Jaya, Selangor

Client

Perunding EIA

Runding Trafik MZK Sdn Bhd conducted a Traffic Impact Assessment for a proposed shop office development at Bandar Puchong Jaya, one of the rapidly growing commercial areas in Selangor.

The assessment focused on evaluating existing traffic conditions, forecasting future traffic demand, and identifying measures to maintain efficient traffic circulation within the surrounding road network. The study was carried out in accordance with local authority requirements and transportation planning guidelines.

Scope of Services

  • Traffic Impact Assessment (TIA)
  • Existing Traffic Condition Assessment
  • Peak Hour Traffic Analysis
  • Access and Circulation Planning
  • Road Network Evaluation
  • Technical Reporting

Project Outcome

The assessment delivered valuable insights into existing and projected traffic conditions surrounding the proposed development. The findings assisted project stakeholders in understanding transportation requirements and supported the preparation of planning-related submissions in accordance with local authority guidelines.

Categories
Traffic Impact Assessment

Traffic Impact Assessment for Proposed Petrol Station and Commercial Complex at Taman Dato’ Ahmad Razali, Ampang, Selangor

Ellipse-about
01_busy_intersection_local

Traffic Impact Assessment for Proposed Petrol Station and Commercial Complex at Taman Dato’ Ahmad Razali, Ampang, Selangor

Client

Ram Architect

Runding Trafik MZK Sdn Bhd was appointed to undertake a Traffic Impact Assessment (TIA) for a proposed petrol station and commercial complex development located at Taman Dato’ Ahmad Razali, Mukim Ampang, Selangor Darul Ehsan.

The study evaluated the anticipated traffic generated by the proposed development and assessed its potential impact on the surrounding road network. Comprehensive traffic surveys, traffic flow analysis, and junction capacity assessments were conducted to ensure that the proposed development could be integrated efficiently into the existing transportation infrastructure.

Scope of Services

  • Traffic Impact Assessment (TIA)
  • Traffic Volume Survey
  • Traffic Generation Analysis
  • Junction Capacity Assessment
  • Development Access Review
  • Authority Submission Support

Project Outcome

The Traffic Impact Assessment provided a comprehensive evaluation of the anticipated traffic generated by the proposed development and its interaction with the surrounding road network. The study supported the planning and development review process by identifying potential traffic considerations and recommending appropriate measures to facilitate safe and efficient vehicle movement.